1- 660 MW Coal Fired Power Plant of Nishat Power at Rahim Yar Khan.

2- 660 MW Coal Fired Thermal Power Plant in Thar, Sindh, Pakistan by Engro Powergen Ltd.

3- Technical support service for 2*330 MW coal-fired Thermal Power Plant by Engro Power Gen Thar (Pvt.) Ltd. at Thar, Sindh, Pakistan.

4- 330 MW Coal Fired Power Plant (HUBCO) at Thar, Sindh, Pakistan.

5- 330 MW Coal Fired Power Plant (ThalNova) at Thar, Sindh, Pakistan.

6- 330 MW Coal Fired Thermal Power Plant in Thar, Sindh, Pakistan by Engro Powergen Ltd.

7- Technical support services for 330 MW Coal Fired Thermal Power Plant by Siddiqsons at Thar, Sindh, Pakistan.

8- 300 MW Coal Fired Thermal Power Plant (CIHC Pak Power Company Ltd.) at Gawadar, Baluchistan, Pakistan.

9- Technical support service for the existing 217 MW Qadirpur Plant by Engro Power Gen Limited.

10- 100 MW Coal Fired Power Plant of Lafarge Cement Plant at Chakwal and study of the availability of reliable power supply.

11- 84 MW Thermal Power Plant by Gulf Power at Eminabad, District Gujranwala, Punjab.

12- 2x 50 MW Coal Fired Power Project by MM Pakistan (Pvt.) Ltd. Sunder Lahore M-3 Faisalabad.

13- Five Coal Fired Thermal Power Projects each of 50 MW of:
a. Elektro Power Ltd.
b. Noble Power Ltd.
c. Saba Power Ltd.
d. Malakwal Power Ltd.
e. Horae Energy Ltd.

14- 15 MW Coal Fired Thermal Power Plant for Century Paper & Broad Mills Ltd.

15- 15 MW Thermal (Gas) Power Plant (Network) by Bestway Cement Ltd.

16- 20 MW Gas Fired Thermal Power Plant, District Sanghar, Sindh, Pakistan, by Pakistan Petroleum Limited.