Load Flow Studies for the Arrangement of Net Metering Facility
1- Consultancy Services for Load Flow Study for Interconnection of Grid-Tie Solar Power System with K-Electric for the arrangement of a Net Metering Facility by Asia Petroleum Ltd.
2- Consultancy Services for Load Flow Study for Interconnection of Grid-Tie Solar Power System with GEPCO for the arrangement of Net Metering Facility by EBR Energy Pakistan (Pvt.) Limited.
3- Consultancy Services for Load Flow Study for Interconnection of Grid-Tie Solar Power Plant of 928.2 kWp with K-Electric for the arrangement of Net Metering Facility by Pakistan Gum Industries (Pvt.) Limited.
4- Consultancy Services for Load Flow Study of 950 kW Grid-Tie Solar for Net Metering Application (Capital University) by Zero Carbon (Pvt.) Limited.
5- Consultancy Services for Load Flow Study of 1 MW Solar PV Generation of Net-Metering Islamabad by Engro Energy Limited.
6- Consultancy Services for Load Flow Study for Interconnection of Grid-Tie Solar Power Plant of 997 kWp with K-Electric for the arrangement of net metering facility by Al-Hamza Trading Company.
7- Consultancy Services for Load Flow Study for Interconnection of Grid-Tie Solar Power Plant of 796 kWp with MEPCO for the arrangement of net metering facility by Orient Energy Systems (Pvt.) Limited.
8- Consultancy Services for Load Flow Study for Interconnection of 490 kW Grid-Tie Solar for Net Metering Application by Alucan (Pvt.) Limited.
9- Consultancy Services for Load Flow Study of 500 KV Grid-Tie Solar by Electroline (Pvt.) Limited at Layyah for Net Metering Application (MEPCO).
10- Consultancy Services for Load Flow Studies of 500 kWp Grid-Tie Solar at Faisalabad for Net Metering Application (Green Volts Energy Pvt. Ltd.)
11- Load Flow Studies of 592.96 kWp Grid-Tie Solar by Firhaj Footwear at Ferozpur Road, Lahore for Net Metering (Resolv Pvt. Ltd.)
12- Load Flow Study for Net Metering Application of Solar Power Plant Unit-1 installed at Kamoki Gujranwala GEPCO (Electroline)
13- Load Flow Study for Net Metering Application of Solar Power Plant Unit-2 installed at Kamoki Gujranwala GEPCO (Electroline)
14- Consultancy Services for Load Flow Studies Of 980 kWp Grid-Tie Solar at Sialkot for Net Metering Application (Alpha Renewables)
15- Load Flow Study for Interconnection of Grid-Tie Solar Power Plant of 607 kWp with LESCO for the arrangement of net metering facility located at Sheikhupura Road (Solis Energy Solutions)
16- Load Flow Study for Interconnection of Bismillah Sehla Processing Plant Grid-Tie Solar Power Plant of 1 MW with LESCO for the arrangement of net metering facility (Green Volts Energy Pvt. Limited)
17- Load Flow Study of 999.81 kWp Grid-Tie Solar Power Plant located at Khusab for Net Metering Application (Tesla industries Pvt. Limited)
18- Consultancy Services for approval of Net Metering Application of 1 MW Grid-Tie Solar Power Plant of Cherat Packaging Limited, Unit-2 located at Plot No. 4, 4-I, 4-II, Road 1-L, Industrial Gadoon Amazai District Swabi, KPK (Greaves Pakistan Pvt. Limited)
19- Load Flow Studies of 450 KWp Grid-Tie Solar at Eminabad for Net Metering Application (Green Volts Energy Pvt. Limited)
20- Consultancy Services for Load Flow Studies of 1 Mwp Grid-Tie Solar Plants at Al Hilal Industries, Multan for Net Metering Application by (DS Global)
21- Load Flow Study of 990 kWp Grid-Tie Solar Power Plant of Mahmood Textile Unit No.6 located at Chowk Sarwar Shaheed, Punjab for acceptance of Net-Metering Application (Mahmood Textile Mills Limited)
22- Load Flow Study of 512 kWp Grid-Tie Solar Power Plant of Mahmood Textile Unit No.1 located at Muzzafargarh, Punjab for acceptance of Net-Metering Application (Mahmood Textile Mills Limited)
23- Load Flow Study of 512 kWp Grid-Tie Solar Power Plant of Mahmood Textile Unit No.1 located at Muzzafargarh, Punjab for acceptance of Net-Metering Application (Mahmood Textile Mills Limited)
24- Load Flow Study of 996.840 kWp Grid-Tie Solar Power Plant of Masood Spinning Mills located at Kasur, Punjab for acceptance of Net-Metering Application (Masood Spinning Mills Limited)
25- Load Flow Study of 996.840 kWp Grid-Tie Solar Power Plant of Masood Spinning Mills located at Kasur, Punjab for acceptance of Net-Metering Application (Masood Spinning Mills Limited)
26- Load Flow Studies of 6 Projects (Masood Fabrics Limited Kabirwala 1 MW, Masood Fabrics Limited Qadirpur 1 MW, Roomi Fabrics Limited Spinning Unit 1 MW, Roomi Fabrics Limited Weaving Unit 1 MW, Safina Rice Mills 740 kW & Mahmood Textile Mills Doubling Unit 502 kW) for acceptance of Net Metering Application from MEPCO (Evolve Consultants Pvt. Limited)
27- Load Flow Study of 1 MWp Grid-Tie Solar Power Plant at Faisalabad for Net-Metering Application by (Reon Energy Solutions)
28- Consultancy Services for Load Flow Studies of 2 Projects of 499 kW Naz Rice Mills Site 1 & Site 2 located at Sahiwal (MEPCO) for approval of Net-Metering Application by (DS Global)
29- Consultancy Services for Load Flow Studies of 2 Projects of 499 kW Naz Rice Mills Site 1 & Site 2 located at Sahiwal (MEPCO) for approval of Net-Metering Application by (DS Global)
30- Load Flow Study for Interconnection of Grid-Tie Solar Power Plant of 1 MW with GEPCO for the arrangement of net metering facility located at Sialkot by (GSolar Pvt. Ltd.)